PROJECTS

  • Eti Bor – Emet Bor Plant Installation 1997 Emet-KUTAHYA –Turkey
  • Istanbul Olympic Stadium mechanical and fire systems installation 2002  Istanbul-Turkey
  • BTC Pipeline Project BOTAS BTC Dir. Pipeline and Hydrostati Testing works 2005  Sivas- Kahramanmaras  Osmaniye – Ceyhan Turkey
  • Hassad Petrochemical Plant Installation 2007  Jubail – Saudi Arabia
  • BP/ATAS Terminal Transformation Project2008  Mersin – Turkey
  • Eren Energy Thermal Power Plant 1260 MW Cooling Marine line 2009  Catalagzı –Zonguldak – Turkey
  • Mey Alcoholic Beverages Tekirdag Factory 2010 Tekirdag – Turkey
  • Besan Starch Factory 2010 Gaziantep – Turkey
  • Tiryaki Agro Mersin and Corum Facilities 2012 Mersin -Corum – Turkey
  • Aves Vegetable Oil Factory 2014 Mersin – Turkey
  • Akimtek Fuel Terminal 2014 Ankara – Turkey
  • Anatolian Terrestrial Fuel Storage and Wagon Evacuation Terminal 2015 Diyarbakir – Turkey
  • Secer Agriculture Tarsus Vegetable Raw Oil Factory  Mersin – Turkey
  • POAS Aliaga Terminal Ethanol Project 2016  Aliaga -IZMIR – Turkey
  • POAS Diyarbakir Terminal Ethanol and Contribution Project 2016  Diyarbakir – Turkey
  • POAS Mersin Terminal Tank Maintenance and Fuel Oil Evacuation Project 2016  Mersin – Turkey
  • POAS Iskenderun Terminal Tank maintenance piping projects 2015-2018 Iskenderun – Turkey
  • POAS Antalya Terminal Tank maintenance piping projects 2016-2018 Iskenderun – Turkey
  • ANAPET Fuel Wagon Evacuation Project 2016 Kirikkale – Turkey
  • TUPRAS SHELF Tank Maintenance Works 2016-2018 Kirikkale – Turkey
  • SAVKA Marine Platform Maintenance Works 2018-2019 Mersin – Turkey
  • Aves South Warehouse East Terminal Maintenance Works 2018-2019 Mersin – Turkey
  • TPPD INC Dortyol Terminal Tank Maintenance Works 2019-2019 Mersin – Turkey
  • Aves -Ataş 18″ Diesel Pipeline 3000 mt 2020-2022 Mersin – Turkey
  • Dolugaz LPG storage and filling terminal. 2020-2023 Dörtyol – Turkey
  • Modular Oil Industry and Trade  Inc . / Corp 2023 Mersin – Turkey
  • Akımtek supply Bioethanol Blending Project; Process Piping, Static and Dynamic Equipment Montaki Testing and Commissioning Work, 200m3 Ethanol  Tank
  • Kirikkale Yahsihan Wagon Transfer Terminal, rehabilitation of transmission lines. (840 meters)
  • Aves Vegetable Oil Factory Mersin; 3 1000m3 biodiesel tanks , 1x1000m3 firewater tank,1000 Tons Day Extraction Unit Installation, 200 Tons Day Vegetable Oil Refinery Installation, Equipment assemblies, Dynamic and Static Equipment Assemblies Process , Piping / Fire Systems Installation
  • Diyarbakir Leylek Station refurbishes, displaces and builds an inflammatory line.(6200 meters & 18 scissors supply and replacement
  • Besan Starch Gaziantep Baspinar; Manufacture of 90 AISI 316 stainless process tanks 340 Tons
  • Eastern Terrestrial Diyarbakir Wagon Fuel Evacuation and Storage Terminal; 2×1000 m3 gasoline, 2×3500 m3, motor 2x100m3 √ethanol, 1x1000m3 fire water storage, Construction of 2 islands 4 platform land tanker filling islands with 160m wagon purpose line evacuation collectors
  • Eren Energy Cutlery Thermal Power Plant; 1260mw 88″ Cooling water sea pipeline 3 km
  • ATAS – AVES Joint Pipeline Project (18″ – 2000 Meters)
  • ATAŞ – AVES 18 “Diesel Pipeline 3000 Meters. Standards 1104, API 31.4/API 31.3

ONGOING PROJECTS/ DEVAM EDEN PROJELER

Dörtyol Dolugaz LPG Storage and Filling Terminal. EPC contracting agreement